We follow Arizona ROC progress-payment standards on every pool project — so you never pay more than 10% ahead of the work that's actually finished. Landscape and non-pool projects use a simple 50 / 35 / 15 schedule tied to mobilization and completion.
Pool builds at AE follow the Arizona Registrar of Contractors recommended schedule — 15 / 25 / 25 / 25 / 10. Each draw is triggered when that phase of work is verifiably complete and (where applicable) has passed inspection.
Down payment when contract is signed and design is finalized. Permits and engineering begin.
Due after excavation is complete and the pool shape is in the ground.
Due after plumbing is set, pressure-tested, and passes rough-in inspection.
Due after the surrounding deck (travertine, pavers, concrete) is laid and grouted.
Final draw — paid right before the pool finish (Pebble Tec / plaster) goes in.
The ROC schedule exists to protect homeowners. If a builder asks for 40-50% upfront on a pool, ask why — the ROC's own consumer guidance recommends no more than 15% down on residential pool contracts. AE Outdoor Living follows the ROC schedule on every pool build.
Pavers, artificial turf, pergolas, outdoor kitchens, landscape lighting, fencing, dog runs, putting greens — anything that isn't a pool — follows a 50 / 35 / 15 schedule. Materials, schedule, and crew are locked in at signing; final draw clears on walkthrough.
Down payment locks in materials, schedule, and crew. Pavers, turf, structures, lighting components are ordered.
Due the day crews mobilize on-site and work begins.
Final draw on walkthrough — paid when the project is finished, cleaned, and signed off.
The fastest way to spot a builder you shouldn't sign with is the payment schedule. Anyone asking for 40, 50, or 60% upfront on a pool is either undercapitalized — meaning they need your deposit to finish someone else's project — or unfamiliar with Arizona ROC guidance.
By staying on the ROC schedule, AE Outdoor Living finances each phase of your build with our own working capital. You only release the next draw when the previous phase is complete. If we don't deliver on a milestone, you don't pay for it.
On landscape projects we ask for more upfront because materials are ordered, custom-fabricated, and delivered before crews mobilize — but the final 15% is held until the project is walked, cleaned, and signed off by you.
Free in-home consultation, custom 3D design preview, fixed-price quote — usually within 24 hours. No surprise change orders.